A demanding simultaneous jacking and lifting of a bridge erected in mid ’90 has been performed by HiSCS for...
Inspection of existing building
hiadmin, , engineering, Inspection, inspection-NDT-evaluation, Maintenance, NDT, news & publishing, 0The inspected structure is a structurally independent building, under construction, consists of 1 basement, 1 ground floor and 4...
External PT in existing building
hiadmin, , engineering, LMK post-tensioning, Maintenance, news & publishing, Post Tensioning, 0A design & check regarding the structural adequacy of the prestressed elements of an existing building in Athens, Greece...
Our team undertook the project to repair the bearing plinths of a highway overpass. Poor construction techniques such as...
HiSCS team performed hydraulic jacking and replacement of two PTFE sliding elastomeric bearings. A jacking force of approximately 1900...
Hydraulic jacking of both abutments was performed by our team, at a highway box girder bridge in Greece. Four...
HiSCS S.A. performed maintenance works aiming to rehabilitate the load path mechanisms of an old reinforced concrete bridge. Poor...
Engineers of HiSCS performed the supervision of installation works of anti-seismic Lead Rubber Bearings (LRB) of a private building...
Replacement of bridge elastomeric expansion joints, west of Athens, Greece.
lmk systems, , Maintenance, 0Bridge maintenance works executed by HiSCS S.A. At this project, 4 meters of bridge expansion joint were replaced in...
The maintenance and repair/replacement works of bridge bearings in several structures in Athens Ring Road/Greece is under progress. Repair...
Recent Posts
- Inspection of Bearings – Akrotiri archaeological shelter – Santorini island – Greece
- Installation of Seismic Isolation Bearings in Building
- Bridge maintenance – Elastomeric Expansion joints replacement
- Highway signs inspection – Evaluation of retroreflectivity values with state-of-the-art equipment
- “Smart Bridges” Project – Installation of RTSHM equipment