The jacking and lifting works to replace the structural bearings supporting the steel pipe racks of an oil terminal...
PT Application in Existing Building for Upgrading Purposes
hiadmin, , engineering, LMK post-tensioning, Maintenance, NDT, news & publishing, Post Tensioning, 0The implementation of post tensioning in an existing building to improve its structural strength has been accomplished by HiSCS....
Jacking & Lifting of Bridge-Bearings Replacement
hiadmin, , Maintenance, news & publishing, Uncategorized, 0A demanding simultaneous jacking and lifting of a bridge erected in mid ’90 has been performed by HiSCS for...
Inspection of existing building
hiadmin, , engineering, Inspection, inspection-NDT-evaluation, Maintenance, NDT, news & publishing, 0The inspected structure is a structurally independent building, under construction, consists of 1 basement, 1 ground floor and 4...
External PT in existing building
hiadmin, , engineering, LMK post-tensioning, Maintenance, news & publishing, Post Tensioning, 0A design & check regarding the structural adequacy of the prestressed elements of an existing building in Athens, Greece...
Our team undertook the project to repair the bearing plinths of a highway overpass. Poor construction techniques such as...
HiSCS team performed hydraulic jacking and replacement of two PTFE sliding elastomeric bearings. A jacking force of approximately 1900...
Hydraulic jacking of both abutments was performed by our team, at a highway box girder bridge in Greece. Four...
HiSCS S.A. performed maintenance works aiming to rehabilitate the load path mechanisms of an old reinforced concrete bridge. Poor...
Engineers of HiSCS performed the supervision of installation works of anti-seismic Lead Rubber Bearings (LRB) of a private building...