HiSCS was involved in evaluating the structural response of an existing comercial reinforced concrete building through a series of...
Developing Skills, Strengthening Our Workplace
hiadmin, , news & publishing, other, Uncategorized, 0At HiSCS, we are committed to fostering a workplace where safety, preparedness, and continuous learning are embedded in our...
Specialized Bridge Inspection and Condition Assessment Services for Critical Transportation Infrastructure, Athens, Greece
hiadmin, , engineering, Inspection, news & publishing, 0HiSCS is proud to have delivered specialized inspection, condition assessment, and technical evaluation services for bridge structures along the...
Expansion Joint Installation in Industrial Freezer Facility, Athens, Greece
hiadmin, , engineering, Maintenance, news & publishing, 0HiSCS has successfully completed the installation of a specialized expansion joint at an industrial building currently under construction in...
How Do You Lift a Landmark? – Jacking and Bearing Replacement at the Corinth Isthmus Bridge
hiadmin, , engineering, Inspection, Maintenance, news & publishing, 0https://youtu.be/V8R47cFg6b0
We are proud to announce that our team has successfully obtained the SafetyPass Certification, reinforcing our commitment to maintaining...
Preventive Maintenance and Rehabilitation of Elastomeric Bridge Bearings
hiadmin, , engineering, Maintenance, news & publishing, 0HiSCS undertook the preventive maintenance program for the elastomeric bearings of a vehicular cantilever box-girder bridge, carrying out a...
Pull-Out Testing of Anchor Bars at Athens International Airport “Eleftherios Venizelos”
hiadmin, , engineering, Evaluation, news & publishing, 0HiSCS successfully carried out the pull-out testing program for the passive support system of the utility tunnel as part...
Bridge Jacking and Bearing Retrofitting of Rawda and University Bridges, Kuwait City
hiadmin, , engineering, news & publishing, 0HiSCS is involved in the jacking and lifting of two (2) bridges at Interchange No. 19 – Rawda Bridge...
Jacking & Lifting of Corinthos Canal Bridge for Bearings Replacement
hiadmin, , engineering, Maintenance, news & publishing, 0HiSCS has recently performed the jacking and lifting of the Corinthos canal (Isthmus) bridge, an iconic and of strategic...
Recent Posts
- Structural Load Testing of Prestressed Concrete Beams, Peloponnese, Greece
- Developing Skills, Strengthening Our Workplace
- Specialized Bridge Inspection and Condition Assessment Services for Critical Transportation Infrastructure, Athens, Greece
- Expansion Joint Installation in Industrial Freezer Facility, Athens, Greece
- How Do You Lift a Landmark? – Jacking and Bearing Replacement at the Corinth Isthmus Bridge









