-
Smart Bridge Monitoring
hiadmin, , engineering, Maintenance, news & publishing, 0
HiSCS accomplished the installation of the monitoring system in an old arched road bridge located in continental Greece (Karpenisi...
-
Highway signs inspection – Evaluation of retroreflectivity values with state-of-the-art equipment
hiadmin, , Inspection, Maintenance, news & publishing, 0
HiSCS’s inspectors executed the inspection of 12 overhead gantries, gantry butterfly signs, and informatory signs of a highway close...
-
Smart Bridges Project Presentation
hiadmin, , engineering, Maintenance, news & publishing, 0
Following the Project Presentation Event, organized by the Technical Chamber of Greece, on the 9th of June 2026, we...
-
Underwater Inspection, Kingdom of Saudi Arabia
lmk systems, , Inspection, 0
HiSCS successfully accomplished in November 2018 a very demanding underwater inspection in Al-Shuqaiq Power Plant & Desalination facilities...
-
Fresh Space, Fresh Energy: Welcome to Our New Offices
hiadmin, , news & publishing, other, Uncategorized, 0
We’re excited to announce our relocation to a newly renovated office building, designed to support the next chapter of...
-
European Technical Assessment Document (ETA) for LMK External Post Tensioning Kit
hiadmin, , engineering, LMK post-tensioning, news & publishing, 0
We welcome our new ETA member in LMK family. We are pleased to announce that the LMK PT system...
-
Bridge jacking & bearing replacement, Athens International Airport – Greece
hiadmin, , engineering, Maintenance, news & publishing, 0
Bridge bearings play a vital role in transferring loads and accommodating movements between a bridge superstructure and its substructure....
-
Hydraulic bridge jacking and replacement of sliding bearings
lmk systems, , Maintenance, 0
HiSCS team performed hydraulic jacking and replacement of two PTFE sliding elastomeric bearings. A jacking force of approximately 1900...
Recent Posts
- Expansion Joint Installation in Industrial Freezer Facility, Athens, Greece
- How Do You Lift a Landmark? – Jacking and Bearing Replacement at the Corinth Isthmus Bridge
- Investing in Safety. Investing in People.
- Preventive Maintenance and Rehabilitation of Elastomeric Bridge Bearings
- Pull-Out Testing of Anchor Bars at Athens International Airport “Eleftherios Venizelos”







