-
Lifting & Jacking of Oil Terminal Jetty – Bearings Replacement
hiadmin, , engineering, Maintenance, news & publishing, 0
The jacking and lifting works to replace the structural bearings supporting the steel pipe racks of an oil terminal...
-
Inspection of existing building
hiadmin, , engineering, Inspection, inspection-NDT-evaluation, Maintenance, NDT, news & publishing, 0
The inspected structure is a structurally independent building, under construction, consists of 1 basement, 1 ground floor and 4...
-
Bridge Bearing Replacement – Single pier jacking & lifting at Athens International Airport El. Venizelos, Greece
hiadmin, , engineering, Maintenance, news & publishing, 0
HiSCS Engineers & Technicians successfully accomplished another jacking & lifting, at the main terminal bridge of Athens Int’l Airport...
-
PT Application in Existing Building for Upgrading Purposes
hiadmin, , engineering, LMK post-tensioning, Maintenance, NDT, news & publishing, Post Tensioning, 0
The implementation of post tensioning in an existing building to improve its structural strength has been accomplished by HiSCS....
-
European Technical Assessment Document (ETA) for LMK External Post Tensioning Kit
hiadmin, , engineering, LMK post-tensioning, news & publishing, 0
We welcome our new ETA member in LMK family. We are pleased to announce that the LMK PT system...
-
Installation of Seismic Isolation Bearings in Building
hiadmin, , engineering, news & publishing, 0
HiSCS’s Engineers & Technicians executed the installation of anti-seismic High Damping Rubber Bearings (HDRB), at a private residential building...
-
New Doubling Track Denchai-Chiang Rai-Chiang Klong in Thailand
hiadmin, , LMK post-tensioning, news & publishing, Post Tensioning, 0
The Den Chai – Chiang Rai – Chiang Khong Railway is a new railway in Northern Thailand. The project...
-
Inspection of Steel Arch Bridge
hiadmin, , engineering, Inspection, news & publishing, 0
The Inspection and evaluation of the bearings, stoppers, shear-keys, and viscous dampers of Tsakona arch steel bridge in Korinthos-Tripoli-Kalamata...
Recent Posts
- Inspection of Bearings – Akrotiri archaeological shelter – Santorini island – Greece
- Installation of Seismic Isolation Bearings in Building
- Bridge maintenance – Elastomeric Expansion joints replacement
- Highway signs inspection – Evaluation of retroreflectivity values with state-of-the-art equipment
- “Smart Bridges” Project – Installation of RTSHM equipment