Concrete Silo Progress
lmk systems, , Post Tensioning, 0
The Concrete Silos in Kuwait are close to completion! That transfer belt Looks like Roller Coaster!
-
Installation of Ducts and Tendons
lmk systems, , Post Tensioning, 0
The progress of, the new 27,5Km road between Saad Al Abdallah to Bohaith gate and the new 40Km road...
-
Post Tensioning Works in Kuching, State of Sarawak, Malaysia
lmk systems, , Post Tensioning, 0
LMK Post Tensioning works at Kuching. Part of the Development and Upgrading of the proposed Pan Borneo highway in the...
-
Concreting in the New 40Km Road Between Mina Abdullah City and Wafra
lmk systems, , Post Tensioning, 0
The first Bridge of RA-238 is being Concreted! Around 2000 m3 of concrete were casted for the first construction...
-
Concrete Silos in Kuwait
lmk systems, , Post Tensioning, 0
Two PT concrete silos, which are intended to store and discharge cement powder in a Kuwaiti cement factory. The project...
-
PT Slabs in GYM, State of Kuwait
lmk systems, , Post Tensioning, 0
Another PT project accomplished successfully in the State of Kuwait. LMK flat anchorages have been used in the slabs...
-
Jeddah – Mekkah New Expressway
lmk systems, , Post Tensioning, 0
LMK is executing the PT supply in 4 bridges in Jeddah – Mekkah New Expressway. In all structures simply...
-
Applying Tendon’s Geometry in the Nnew 27,5Km Road Between Saad Al Abdallah to Bohaith Gate
lmk systems, , Post Tensioning, 0
Proper implementation of tendon’s geometry is one of the key parameters for a successful Post Tensioning application in terms...
Recent Posts
- “Smart Bridges” Project – Installation of RTSHM equipment
- European Technical Assessment Document (ETA) for LMK External Post Tensioning Kit
- Inspection of Athens Int’l Airport, access bridges
- Calatrava Stayed Cable Bridge – Special Inspection & Maintenance