-
Seismic base-Isolation of private building
lmk systems, , Maintenance, 0
Engineers of HiSCS performed the supervision of installation works of anti-seismic Lead Rubber Bearings (LRB) of a private building...
-
Bridge maintenance – Elastomeric Expansion joints replacement
hiadmin, , Maintenance, news & publishing, 0
We have completed the selective replacement of six elastomeric expansion joint mats, located in several places on a bridge...
-
Inspection of Viscous Dampers
hiadmin, , engineering, Inspection, inspection-NDT-evaluation, news & publishing, 0
The Inspection of fifty (50) viscous dampers located in the steel roof of main terminal building of Athens Int’l...
-
Bridge Maintenance: Elastomeric Expansion Joints Replacement
hiadmin, , engineering, Maintenance, news & publishing, 0
Maintaining the integrity and safety of bridge infrastructure is a continuous effort — and one of the most critical...
-
Jacking & Lifting of Bridge for Bearings Urgent Repair Works
lmk systems, , Maintenance, 0
The remedial works executed by HiSCS did restore temporarily the contact areas of elastomeric bearings of an over 40...
-
Working at Height – General Applications: Training Course Highlights
hiadmin, , engineering, news & publishing, 0
Οur team had the opportunity to participate in the specialized training course “Working at Height – General Applications.” The...
-
Developing Skills, Strengthening Our Workplace
hiadmin, , news & publishing, other, Uncategorized, 0
At HiSCS, we are committed to fostering a workplace where safety, preparedness, and continuous learning are embedded in our...
-
Investing in Safety. Investing in People.
hiadmin, , news & publishing, other, Uncategorized, 0
We are proud to announce that our team has successfully obtained the SafetyPass Certification, reinforcing our commitment to maintaining...
Recent Posts
- Structural Load Testing of Prestressed Concrete Beams, Peloponnese, Greece
- Developing Skills, Strengthening Our Workplace
- Specialized Bridge Inspection and Condition Assessment Services for Critical Transportation Infrastructure, Athens, Greece
- Expansion Joint Installation in Industrial Freezer Facility, Athens, Greece
- How Do You Lift a Landmark? – Jacking and Bearing Replacement at the Corinth Isthmus Bridge







