Overnight Bridge Expansion Joint Replacement Works, Athens, Greece

Five elastomeric expansion joint units, each 2 metres in length, were successfully replaced over a series of overnight maintenance operations.

Due to the high traffic volumes, the works were carried out overnight to minimise disruption to road users. The replacement works were undertaken across several traffic lanes at a busy highway junction. Appropriate traffic management measures and temporary traffic arrangements were implemented to ensure the safety of both the workforce and road users throughout the operations.

The works were carried out using our specialised elastomeric joint deformation system, specifically designed to facilitate the controlled deformation required for the replacement of expansion joints on existing bridges, as well as the presetting of joints for installation in new bridges.

Another successful bridge maintenance operation, combining specialised equipment, technical expertise and careful planning to ensure the continued performance and serviceability of bridge expansion joints.

©[2022] Reyelise Ltd.

CONTACT US

We're not around right now. But you can send us an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?