Our concrete Silos are close to their final height!
Silos are Getting Taller
Related Articles
-
Concreting in the New 40Km Road Between Mina Abdullah City and Wafra
lmk systems, , Post Tensioning, 0
The first Bridge of RA-238 is being Concreted! Around 2000 m3 of concrete were casted for the first construction...
-
-
Application of LMK PT system in concrete slabs in Dubai, UAE
lmk systems, , Post Tensioning, 0
Application of LMK bonded PT system, in concrete slabs, at a multistorey luxury residential building in Dubai. One Park...
-
-
Tatau Bridge in Malaysia
lmk systems, , Post Tensioning, 0
Completion of final stitching and stressing of box-girder in Tatau bridge at Pan Borneo Highway using LMK-S19M15 anchorages....
-
LMK Strong Presence in Kuwait
lmk systems, , Post Tensioning, 0
LMK awarded another two projects, the new 27,5Km road between Saad Al Abdallah to Bohaith gate (RA-238) and a...
-
Tamdeen Square Towers
lmk systems, , Post Tensioning, slider, 0
A recent picture of a finished project of LMK Post Tensioning system, back from 2018. Tamdeen towers remain the...
-
Completion of PT Works at the New Road Between Saad Al Abdallah to Bohaith Gate
lmk systems, , Post Tensioning, 0
Post Tensioning works have been completed at the new road between Saad Al Abdallah to Bohaith gate in Kuwait.
Recent Posts
- Calatrava Stayed Cable Bridge – Special Inspection & Maintenance
- Bridge Bearing Replacement – Single pier jacking & lifting at Athens International Airport El. Venizelos, Greece
- Jacking & lifting of Mall for Seismic Isolation Bearings Replacement
- Bridge Bearing replacement at Athens International Airport El. Venizelos, Greece
- Lifting & Jacking of Oil Terminal Jetty – Bearings Replacement
Recent Comments
No comments to show.