Bridge jacking and replacement of bearings

Bridge jacking and replacement of bearings
July 9, 2020 lmk systems

Hydraulic jacking of both abutments was performed by our team, at a highway box girder bridge in Greece. Four (4) sliding guided elastomeric bearings were replaced in total, while the jacking load reached 3000 kN at each location. Also, non-replaceable exposed metal parts were repainted to prevent corrosion and the sliding surfaces were preserved accordingly.