LMK Post tensioning system is being implemented in a multistorey residential building in Kuwait. The building will be 117m...
HiSCS team performed hydraulic jacking and replacement of two PTFE sliding elastomeric bearings. A jacking force of approximately 1900...
Kuwait Infrastructures Drone Footages. A video edited and produced by Eng. Mourad Halimi, showing breathtaking views of Kuwait city...
HiSCS has been accomplished the inspection and evaluation of Duba sea-port container terminal facilities. Duba Port is a multipurpose...
Hydraulic jacking of both abutments was performed by our team, at a highway box girder bridge in Greece. Four...
HiSCS’s engineers performed an overnight bridge inspection to assess and evaluate the condition of an old and overused reinforced...
HiSCS Inspectors accomplished successfully the external inspection, while in service, of three (3) crude oil storage tanks located in...
HiSCS S.A. performed maintenance works aiming to rehabilitate the load path mechanisms of an old reinforced concrete bridge. Poor...
Engineers of HiSCS performed the supervision of installation works of anti-seismic Lead Rubber Bearings (LRB) of a private building...
A recent update from a completed project of LMK Post Tensioning system. Tamdeen Towers located in Sabah Al Salem...
Recent Posts
- Inspection of Bearings – Akrotiri archaeological shelter – Santorini island – Greece
- Installation of Seismic Isolation Bearings in Building
- Bridge maintenance – Elastomeric Expansion joints replacement
- Highway signs inspection – Evaluation of retroreflectivity values with state-of-the-art equipment
- “Smart Bridges” Project – Installation of RTSHM equipment