-
European Technical Assessment Document (ETA) for LMK Post Tensioning Kit
Read moreDear LMK family, We have experienced hardship and adversity living through COVID-19 pandemic, global uncertainties and in many cases personal…
00 -
-
-
-
-
-
-
-
-
Dear LMK family, We have experienced hardship and adversity living through COVID-19 pandemic, global uncertainties and in many cases personal…
LMK Post Tensioning system is being implemented in a multistorey luxury residential building in Dubai. The building will be composed…
LMK Post tensioning system is being implemented in a multistorey residential building in Kuwait. The building will be 117m high,…
HiSCS team performed hydraulic jacking and replacement of two PTFE sliding elastomeric bearings. A jacking force of approximately 1900 tons…
HiSCS has been accomplished the inspection and evaluation of Duba sea-port container terminal facilities. Duba Port is a multipurpose port…
Hydraulic jacking of both abutments was performed by our team, at a highway box girder bridge in Greece. Four (4)…
HiSCS’s engineers performed an overnight bridge inspection to assess and evaluate the condition of an old and overused reinforced concrete…
HiSCS Inspectors accomplished successfully the external inspection, while in service, of three (3) crude oil storage tanks located in a…
HiSCS S.A. performed maintenance works aiming to rehabilitate the load path mechanisms of an old reinforced concrete bridge. Poor construction…
Engineers of HiSCS performed the supervision of installation works of anti-seismic Lead Rubber Bearings (LRB) of a private building located…